THE CONCRETE BRIDGE MAGAZINE

WINTER 2009

ASPIRE is a quarterly magazine published by PCI in cooperation with the associations of the National Concrete Bridge Council. The editorial content focuses on the latest technology and key issues in the Concrete Bridge Industry.

Issue link: http://www.aspiremagazinebyengineers.com/i/306858

Contents of this Issue

Navigation

Page 23 of 74

profile FOLSOM LAKE CROSSING / FOLSOM, CALIF. CONTRACTING AGENCy: U. S. Army Corps of Engineers, Sacramento District, South Pacific Division ENGINEER: CH2M HILL/URS Joint Venture, Sacramento and Roseville, Calif. CONSTRUCTION ENGINEER: McNary Bergeron and Associates, Broomfield, Colo. PRIME CONTRACTOR: Kiewit Pacific Co., Vancouver, Wash. CONCRETE SUPPLIER: A & A Ready Mixed Concrete, Inc. Newport Beach, Calif. POST-TENSIONING: Schwager Davis, Inc. San Jose, Calif. Folsom Lake Crossing Design and Construction – by Hans Strandgaard, Alex Harrison, Jeff Aldrich, and Jeff Thomure, CH2M HILL The cantilevers nearly touching and ready for closures in October 2008. View of the Folsom Dam and the canyon just upstream of construction. The area was pristine due to restrictions on access by the Folsom State Prison and Bureau of Reclamation. 22 | ASPIRE , Winter 2009

Articles in this issue

Archives of this issue

view archives of THE CONCRETE BRIDGE MAGAZINE - WINTER 2009