THE CONCRETE BRIDGE MAGAZINE

SUMMER 2014

ASPIRE is a quarterly magazine published by PCI in cooperation with the associations of the National Concrete Bridge Council. The editorial content focuses on the latest technology and key issues in the Concrete Bridge Industry.

Issue link: http://www.aspiremagazinebyengineers.com/i/335723

Contents of this Issue

Navigation

Page 35 of 49

STATE ALASKA Concrete bridges in extreme and remote environments By Leslie Daugherty and Elmer Marx, Alaska Dept. of Transportation & Public Facilities Concrete bridges are a practical way to deal with Alaska’s many design and construction challenges, including short construction seasons, remote locations, temperature extremes, seismic demands, and coastal environments. Currently, 44% of Alaska’s state and local bridge inventory is concrete, but concrete accounts for approximately 80% of the new bridges built by the Alaska Department of Transportation & Public Facilities (DOT&PF). The state’s oldest concrete bridges date back to the 1930s, but innovative girder shapes and enhanced materials allowed for the development of the Alaska DOT&PF’s preferred superstructure type—the prestressed concrete decked bulb-tee girder. Evolution of Concrete Bridges Different configurations of precast, prestressed and post-tensioned concrete bridges were built during the 1970s and 1980s, including an impressive example of an early segmental, cast-in-place concrete box girder bridge—the award-winning Gastineau Channel Bridge. The Alaska DOT&PF designed the bridge in 1979 to replace the only link from Alaska’s capital city, Juneau, to neighboring Douglas Island, where a significant portion of its population lives. This three-span bridge is 44 ft wide and has a total length of 1286 ft. The 620-ft-long center span is comprised of two 250-ft-long cantilevers from the piers and a 120-ft-long suspended span. Both vertical and longitudinal post-tensioning were used and contributed to the bridge’s graceful shape. Since the early 1970s, Alaska DOT&PF has been designing precast, prestressed concrete decked bulb-tee girder bridges using high-strength concrete (HSC). Decked bulb-tee girders are similar to concrete I-girders, but the upper flange is wide enough to also act as the bridge deck. Using this girder shape eliminates the need to cast and cure a conventional concrete bridge deck, greatly accelerating the superstructure construction time. In addition, by being precast, the entire superstructure has higher strengths and receives better quality control. Initially, design concrete strengths were 5.5 ksi at transfer of prestress and 6.5 ksi at 28 days. It was presumed that improved durability would be one benefit of the increased concrete strength and no performance requirements such as chloride permeability, abrasion resistance, or freezing and thawing resistance were specified. Forty years and hundreds of bridges located in extreme environments have proven this assumption to be true. By the late 1990s, concrete strengths at transfer of 7.5 ksi and 28-day strengths of 8.0 ksi were specified. The need to consistently obtain the high release strength in a short period of time (typically around 18 hours) resulted in actual 28-day concrete strengths of 10 ksi or higher. As the specified concrete release strength has increased, there has been no change in the daily production cycle and no significant cost increase has occurred. With the adoption of HSC, longer bulb-tee girders could also be designed. The Alaska-style decked bulb-tee girders come in standard depths of 42, 54, and 66 in. Typical girder spans range from 85 ft for a 42-in.-deep section to 145 ft for a 66-in.-deep section. Longer span lengths are technically feasible, but transportation from the precaster to the jobsite becomes an obstacle. The typical top flange width of the decked bulb-tee girders varies from 6 to 8 ft with a maximum possible width of 8.5 ft. A typical two-lane bridge consists of five or six girders, depending on the girder length and required roadway geometry. The deck is an integral component of the flexural system and is designed to remain in compression under all service load combinations. Alaska DOT&PF policy limits tensile stress after losses to zero under the service limit state. Shear keys and tabs, typically spaced at 4 ft along the longitudinal joints of the interior flanges, are used to connect adjacent girders. At the weld-tab locations within the shear keys, steel plates are welded to embedded inserts of adjacent flanges for a rigid connection. Next the shear keys and longitudinal joints are filled with high-strength grout to complete the shear transfer and for corrosion protection. Most decked bulb-tee girder bridges then receive a waterproofing membrane and asphalt riding surface, which has proven to be effective at keeping water from entering the joints and underside of the superstructure. Durable to the Elements The long-term durability and wear-resistance of bulb-tee decks has proven to be outstanding. There has been almost no girder-related maintenance required on the 273 bridges of this (continued next page)

Articles in this issue

Archives of this issue

view archives of THE CONCRETE BRIDGE MAGAZINE - SUMMER 2014