THE CONCRETE BRIDGE MAGAZINE

FALL 2016

ASPIRE is a quarterly magazine published by PCI in cooperation with the associations of the National Concrete Bridge Council. The editorial content focuses on the latest technology and key issues in the Concrete Bridge Industry.

Issue link: http://www.aspiremagazinebyengineers.com/i/740919

Contents of this Issue

Navigation

Page 51 of 55

50 | ASPIRE Fall 2016 Post-tensioning makes possible the cost-effective construction of high-quality bridges over a wide range of site conditions and design requirements. Bridge structures constructed using post-tensioning have high intrinsic durability and are able to be built quickly with minimal impact on the natural and human environment. • Level 1 & 2 Bonded PT Field Specialist Certification • PTI DC45.1-12: Recommendations for Stay-Cable Design, Testing and Installation • PTI M50.3-12: Guide Specification for Grouted Post-Tensioning • PTI M55.1-12: Specification for Grouting of PT Structures PTI offers technical guidance, training and certification programs, and events to enhance your n ext bridge project. 2017 PTI Convention, April 30-May 3 Hyatt Regency Atlanta Atlanta, Georgia www.Post-Tensioning.org The best American jobs are only done once. Every American job should produce results that last. By using concrete, our nation is building infrastructure that serves today's needs while accommodating those of future generations. A job done right is a job done once. And a job done right with concrete stays done, period.

Articles in this issue

Links on this page

Archives of this issue

view archives of THE CONCRETE BRIDGE MAGAZINE - FALL 2016